{"id":36015,"date":"2026-02-03T15:32:45","date_gmt":"2026-02-03T14:32:45","guid":{"rendered":"https:\/\/evalore.es\/wp\/?p=36015"},"modified":"2026-02-04T13:51:10","modified_gmt":"2026-02-04T12:51:10","slug":"breeam-international-new-construction-guide-for-certifying-a-project-outside-spain","status":"publish","type":"post","link":"http:\/\/evalore.es\/en\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/","title":{"rendered":"BREEAM International New Construction: Do you want to certify a project outside of Spain?"},"content":{"rendered":"<!--more-->\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Introduction<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If you are going to develop or certify a project outside of Spain, BREEAM International New Construction is one of the most widely used and prestigious standards. In this article, we will look at this assessment and certification framework with a practical approach: how to choose the correct scheme, how the rating is calculated, what changes compared to V6, and how to manage the evidence to reach the end of construction without problems.<\/p>\n\n\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. What is BREEAM International New Construction and when does it apply<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BREEAM New Construction<strong> <\/strong>is an evaluation framework and <a href=\"https:\/\/evalore.es\/en\/wp\/service\/environmental-certifications\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>sustainability certification<\/strong><\/a> for projects and buildings that reviews design, construction, intended use and adaptability, with a holistic approach based on actual scientific measurements and data. Generally speaking, it is similar to <a href=\"https:\/\/evalore.es\/en\/wp\/building-sustainability-breeam-certification\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>BREAAM ES<\/strong><\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BREEAM International can apply to all countries. If the country has a local scheme, it is usually appropriate to apply that national scheme instead of the international one, as is the case with <a href=\"https:\/\/evalore.es\/en\/wp\/breeam-certification-is-an-internationally-recognised-environmental-assessment-method-for-buildings\/\"><strong>Spain<\/strong><\/a>, UK and Germany.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The country in which the project is being carried out determines the evaluation tool, the weightings, the approved national standards, and the required evidence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. How is the rating calculated in BREEAM International<\/strong> <strong>Nyopf\u00f8relse<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BREEAM International New Construction is organised into 10 sections that award credits within classic environmental categories such as management, health and well-being, energy, transport, water, materials, waste, ecology, pollution, and innovation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"333\" src=\"https:\/\/evalore.es\/wp\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2-1024x333.png\" alt=\"Countries with local BREEAM certification schemes\" class=\"wp-image-36033\" style=\"width:840px;height:auto\" srcset=\"https:\/\/evalore.es\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2-1024x333.png 1024w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2-300x98.png 300w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2-768x250.png 768w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2-1536x499.png 1536w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/tabla_breeam_esquemas-2.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center has-text-color has-link-color wp-elements-ddee8924cfa9a9133020b76dcd1286bb wp-block-paragraph\" style=\"color:#afafaf\"><em>Countries with local BREEAM certification schemes<\/em>. <em>Source: Evaluate (own analysis)<\/em>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The final score is calculated according to the credits obtained and the percentages of each category, applying weights and summing. According to the level that is sought to be achieved (<em>PASS\/GOOD\/VERY GOOD\/EXCELLENT\/OUTSTANDING<\/em>, there are minimum mandatory credits that must be met.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In<a href=\"https:\/\/breeam.com\/standards\/new-construction\" target=\"_blank\" rel=\"noreferrer noopener\"> <strong>BREEAM<\/strong><\/a> Internationally, the weightings, i.e. the percentages that each category represents within the overall framework, can vary by country or region.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left has-contrast-3-color has-text-color has-link-color wp-elements-6cea4ac04645ed2d9246a5675d0deac1\"><span style=\"color: #000000;\"><strong><strong><strong>3. Step-by-step certification process<\/strong><\/strong><\/strong><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BREEAM requires parallel management alongside the project, involving responsible parties, evidence, milestones, and change control.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img decoding=\"async\" width=\"1699\" height=\"485\" src=\"https:\/\/evalore.es\/wp\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international.png\" alt=\"BREEAM Certification Process\" class=\"wp-image-35990\" style=\"width:840px;height:auto\" srcset=\"https:\/\/evalore.es\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international.png 1699w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international-300x86.png 300w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international-1024x292.png 1024w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international-768x219.png 768w, https:\/\/evalore.es\/app\/uploads\/2026\/02\/breeam_proceso_breeam_international-1536x438.png 1536w\" sizes=\"(max-width: 1699px) 100vw, 1699px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center has-text-color has-link-color wp-elements-d9c9776c1eaf34b6d496d37c1e9bde50 wp-block-paragraph\" style=\"color:#afafaf\">   BREEAM certification process. <em>Source: Evaluate (own analysis)<\/em>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work process to achieve certification consists of the following six steps:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1 \u2014 Registration and scope <\/strong>Define the project type, scope (shell-only \/ shell &amp; core \/ fully fitted), country, and timeline. A well-planned record avoids redoing the structure of evidence and responsibilities mid-way, which means delays in the process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2 \u2014 Credit strategy: <\/strong>Select credits by impact\/effort and decide on the minimum requirements for the target level (PASS\/GOOD\/VERY GOOD\/EXCELLENT\/OUTSTANDING) soon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3 \u2014 Evidence Matrix: <\/strong>To define the responsible parties for each section, the deliverables, dates, and reviews by Evalore must be established.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4 \u2014 Design Stage (optional and recommended): <\/strong>Ensure the commitment of all involved parties in the early stages to align objectives, tenders, procurement, and contracts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5 \u2014 Post-Construction (mandatory) <\/strong>Provide evidence of execution and verification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6 \u2014 QA and broadcast: <\/strong>Review and issuance of the certificate following quality control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"color: #000000;\"><strong><strong><strong>4. What changes in version V7<\/strong><\/strong><\/strong><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/breeam.com\/breeam-newconstructionv7\" target=\"_blank\" rel=\"noreferrer noopener\">V7<\/a> it aligns much more closely with the EU Taxonomy as it reinforces the direction towards decarbonisation, focusing on consistency in monitoring and verification through reporting. In practice, BREEAM International demands more robust early decisions and documentary discipline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"color: #000000;\"><strong><strong><strong>5. Common mistakes and how to avoid them<\/strong><\/strong><\/strong><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Choosing the wrong scheme: <\/strong>Confirm if the national\/NSO scheme exists and if the International one applies.<\/li>\n\n\n\n<li><strong>Starting late without an evidence-based strategy <\/strong>Define a matrix of evidence, responsibilities, and controls. Without this, the loss of credits is usually due to a lack of documentation, not technical issues.<\/li>\n\n\n\n<li><strong>Do not review minimum requirements at the conceptual stage: <\/strong>If the target is high, review minimums and their impact on systems\/materiality before bidding.<\/li>\n\n\n\n<li><strong>Assume equivalences without approval <\/strong>Validate local standards and follow the equivalence process.<\/li>\n\n\n\n<li><strong>Leave the evidence until the end: <\/strong>The evidence is produced during the project; at the end it is only ordered and verified.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>6. Frequently Asked Questions (FAQ)<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does BREEAM New Construction expire or require recertification?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BREEAM New Construction validates the design and as-built delivery phase. If performance in operation needs to be verified, an in-use building scheme is used (e.g., BREEAM In-Use).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What is the practical difference between the Design Stage and Post-Construction?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Design Stage (optional) allows for interim certification based on the design. Post-Construction (mandatory) verifies as-built evidence and issues the final certificate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can local regulations be used instead of BREEAM cited standards?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is a process for reviewing local standard equivalencies and approving them for the country or region; the list of approved standards is managed on the platform.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What makes a project lose marks at the end?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The frequent cause is documentary: incomplete evidence, changes not reflected in as-built drawings, or contractor deliverables not aligned with criteria.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>7. How does Evalore accompany you?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In <a href=\"https:\/\/evalore.es\/en\/wp\/?utm_term&amp;adgroup&amp;device=c&amp;network=x&amp;placement&amp;creative&amp;gad_campaignid=22257093765\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Evaluate<\/strong><\/a> We convert the BREEAM International NC certification into a controllable process that reduces uncertainties regarding deadlines, changes, and additional work. We apply BREEAM by minimising the need for extra reporting and always focusing on cost-effectiveness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To provide a realistic and fast quote, tell us about:<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<ul class=\"wp-block-list\">\n<li>Country and city<\/li>\n\n\n\n<li>Building type and scope<\/li>\n\n\n\n<li>Approximate surface area and project phase<\/li>\n\n\n\n<li>Calendar<\/li>\n\n\n\n<li>Motivation<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;If you want us to help you certify your building, <a href=\"https:\/\/evalore.es\/en\/wp\/contact\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>contact<\/strong><\/a> with us.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image alignleft size-full\"><img decoding=\"async\" width=\"97\" height=\"96\" src=\"https:\/\/evalore.es\/wp\/app\/uploads\/2024\/01\/Israel-Vegas-e1561475833384.png\" alt=\"\" class=\"wp-image-34412\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><span style=\"color: #808080;\"> <\/span><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"color: #333333;\"><strong><span style=\"color: #808080;\">Israel Leal <span style=\"color: #333333;\"><strong><span style=\"color: #808080;\">Las Vegas <\/span><\/strong><\/span><\/span><\/strong><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"color: #808080;\">Sustainability Consultant and BREEAM International Assessor, Espacios Evalore SLP<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>If you are developing or certifying a project outside of Spain, BREEAM International New Construction is one of the most widely used and prestigious standards. This article explains it with a practical focus: when it applies, how the rating is calculated, what changes in V7, and how to organise a matrix of evidence, responsibilities, and milestones to achieve certification without unforeseen issues. Evalore will support you to make the process predictable, efficient, and defensible, from design to final certification.<\/p>","protected":false},"author":1,"featured_media":36030,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[135,80,52],"tags":[137,159,92],"class_list":["post-36015","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-certificacion-breeam","category-rehabilitacion-energetica","category-sostenibilidad","tag-breeam","tag-breeam-internacional-nc","tag-sostenibilidad"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BREEAM International New Construction<\/title>\n<meta name=\"description\" content=\"BREEAM International New Construction: qu\u00e9 es, cu\u00e1ndo aplica y el cu\u00e1l es el proceso para certificar un proyecto fuera de Espa\u00f1a\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/evalore.es\/en\/breeam-international-new-construction-guide-for-certifying-a-project-outside-spain\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BREEAM International New Construction\" \/>\n<meta property=\"og:description\" content=\"BREEAM International New Construction: qu\u00e9 es, cu\u00e1ndo aplica y el cu\u00e1l es el proceso para certificar un proyecto fuera de Espa\u00f1a\" \/>\n<meta property=\"og:url\" content=\"https:\/\/evalore.es\/en\/breeam-international-new-construction-guide-for-certifying-a-project-outside-spain\/\" \/>\n<meta property=\"og:site_name\" content=\"Evalore\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-03T14:32:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-04T12:51:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/\"},\"author\":{\"name\":\"administrador\",\"@id\":\"https:\\\/\\\/evalore.es\\\/#\\\/schema\\\/person\\\/d5e313a000a334a092ecaa53c5a36533\"},\"headline\":\"BREEAM International New Construction: \u00bfQuieres certificar un proyecto fuera de Espa\u00f1a?\",\"datePublished\":\"2026-02-03T14:32:45+00:00\",\"dateModified\":\"2026-02-04T12:51:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/\"},\"wordCount\":953,\"publisher\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2026\\\/02\\\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg\",\"keywords\":[\"BREEAM\",\"BREEAM INTERNACIONAL NC\",\"Sostenibilidad\"],\"articleSection\":[\"Certificaci\u00f3n BREEAM\",\"Rehabilitaci\u00f3n Energ\u00e9tica\",\"Sostenibilidad\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/\",\"url\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/\",\"name\":\"BREEAM International New Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2026\\\/02\\\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg\",\"datePublished\":\"2026-02-03T14:32:45+00:00\",\"dateModified\":\"2026-02-04T12:51:10+00:00\",\"description\":\"BREEAM International New Construction: qu\u00e9 es, cu\u00e1ndo aplica y el cu\u00e1l es el proceso para certificar un proyecto fuera de Espa\u00f1a\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#primaryimage\",\"url\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2026\\\/02\\\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg\",\"contentUrl\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2026\\\/02\\\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg\",\"width\":1500,\"height\":1000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/evalore.es\\\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/evalore.es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BREEAM International New Construction: \u00bfQuieres certificar un proyecto fuera de Espa\u00f1a?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/evalore.es\\\/#website\",\"url\":\"https:\\\/\\\/evalore.es\\\/\",\"name\":\"Evalore\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/evalore.es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/evalore.es\\\/#organization\",\"name\":\"Evalore\",\"url\":\"https:\\\/\\\/evalore.es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/evalore.es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2023\\\/12\\\/evalore_blanco_300-e1587695291843.png\",\"contentUrl\":\"https:\\\/\\\/evalore.es\\\/app\\\/uploads\\\/2023\\\/12\\\/evalore_blanco_300-e1587695291843.png\",\"width\":180,\"height\":45,\"caption\":\"Evalore\"},\"image\":{\"@id\":\"https:\\\/\\\/evalore.es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/evalore.es\\\/#\\\/schema\\\/person\\\/d5e313a000a334a092ecaa53c5a36533\",\"name\":\"administrador\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g\",\"caption\":\"administrador\"},\"sameAs\":[\"https:\\\/\\\/evalore.es\\\/wp\\\/\\\/wp\"],\"url\":\"http:\\\/\\\/evalore.es\\\/en\\\/author\\\/administrador\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BREEAM International New Construction","description":"BREEAM International New Construction: what it is, when it applies, and the process for certifying a project outside of Spain","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/evalore.es\/en\/breeam-international-new-construction-guide-for-certifying-a-project-outside-spain\/","og_locale":"en_GB","og_type":"article","og_title":"BREEAM International New Construction","og_description":"BREEAM International New Construction: qu\u00e9 es, cu\u00e1ndo aplica y el cu\u00e1l es el proceso para certificar un proyecto fuera de Espa\u00f1a","og_url":"https:\/\/evalore.es\/en\/breeam-international-new-construction-guide-for-certifying-a-project-outside-spain\/","og_site_name":"Evalore","article_published_time":"2026-02-03T14:32:45+00:00","article_modified_time":"2026-02-04T12:51:10+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg","type":"image\/jpeg"}],"author":"administrador","twitter_card":"summary_large_image","twitter_misc":{"Written by":"administrador","Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#article","isPartOf":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/"},"author":{"name":"administrador","@id":"https:\/\/evalore.es\/#\/schema\/person\/d5e313a000a334a092ecaa53c5a36533"},"headline":"BREEAM International New Construction: \u00bfQuieres certificar un proyecto fuera de Espa\u00f1a?","datePublished":"2026-02-03T14:32:45+00:00","dateModified":"2026-02-04T12:51:10+00:00","mainEntityOfPage":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/"},"wordCount":953,"publisher":{"@id":"https:\/\/evalore.es\/#organization"},"image":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#primaryimage"},"thumbnailUrl":"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg","keywords":["BREEAM","BREEAM INTERNACIONAL NC","Sostenibilidad"],"articleSection":["Certificaci\u00f3n BREEAM","Rehabilitaci\u00f3n Energ\u00e9tica","Sostenibilidad"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/","url":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/","name":"BREEAM International New Construction","isPartOf":{"@id":"https:\/\/evalore.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#primaryimage"},"image":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#primaryimage"},"thumbnailUrl":"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg","datePublished":"2026-02-03T14:32:45+00:00","dateModified":"2026-02-04T12:51:10+00:00","description":"BREEAM International New Construction: what it is, when it applies, and the process for certifying a project outside of Spain","breadcrumb":{"@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#primaryimage","url":"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg","contentUrl":"https:\/\/evalore.es\/app\/uploads\/2026\/02\/MediaCityUK_Certificado_BREEAM_Urbanismo_-Chapman-Taylor-1.jpg","width":1500,"height":1000},{"@type":"BreadcrumbList","@id":"https:\/\/evalore.es\/breeam-international-new-construction-guia-para-certificar-un-proyecto-fuera-de-espana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/evalore.es\/"},{"@type":"ListItem","position":2,"name":"BREEAM International New Construction: \u00bfQuieres certificar un proyecto fuera de Espa\u00f1a?"}]},{"@type":"WebSite","@id":"https:\/\/evalore.es\/#website","url":"https:\/\/evalore.es\/","name":"Evaluate","description":"","publisher":{"@id":"https:\/\/evalore.es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/evalore.es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/evalore.es\/#organization","name":"Evaluate","url":"https:\/\/evalore.es\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/evalore.es\/#\/schema\/logo\/image\/","url":"https:\/\/evalore.es\/app\/uploads\/2023\/12\/evalore_blanco_300-e1587695291843.png","contentUrl":"https:\/\/evalore.es\/app\/uploads\/2023\/12\/evalore_blanco_300-e1587695291843.png","width":180,"height":45,"caption":"Evalore"},"image":{"@id":"https:\/\/evalore.es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/evalore.es\/#\/schema\/person\/d5e313a000a334a092ecaa53c5a36533","name":"Administrator","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5a392de0da573aca49caba85e76b30a28f753ac03d9182b6b44609a3afdf51f7?s=96&d=mm&r=g","caption":"administrador"},"sameAs":["https:\/\/evalore.es\/wp\/\/wp"],"url":"http:\/\/evalore.es\/en\/author\/administrador\/"}]}},"_links":{"self":[{"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/posts\/36015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/comments?post=36015"}],"version-history":[{"count":0,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/posts\/36015\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/media\/36030"}],"wp:attachment":[{"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/media?parent=36015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/categories?post=36015"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/evalore.es\/en\/wp-json\/wp\/v2\/tags?post=36015"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}